This project involves the rehabilitation of 21.1 miles of Georgia State Routes, as well as 7.4 miles on I-285, 8.5 miles on I-20 in the Atlanta area, and 5.2 miles on I-85 from Metropolitan Parkway to Riverdale Road. The scope of work includes full-depth Portland Cement Concrete (PCC) repairs using P2K concrete during night shifts, spall repairs, joint sealing, striping, and the resurfacing of asphalt shoulders.